Dale Farm (Newry)
Installation of chilled water system up grade.
Draynes Farm
Design, supply and installation or 180kw packaged water chiller.
Kerry Foods (Portadown)
Supply and installation of refrigeration pipe work to upgrade refrigeration systems. Refrigerant R22 change out to comply with new F Gas regulations to all refrigeration systems including compressor overhauls.
Kerry Foods (Omagh)
Replacement of four 500kW cooling tower sections and upgrade of control system to water chill plant to increase efficiency and reduce electricity costs.
TMC Dairies
Upgrade of existing ammonia chilled water system.
Dale Farm (Cookstown)
Design, supply and installation of a 1000Kw ammonia water chill system, a refrigeration system to cheese chill store and also a of new 750Kw evaporative condenser for an ammonia refrigeration system.
Dale Farm (Ballymena)
Design, supply and installation of milk distribution chill store, (120Kw) marshaling area and dispatch store (240Kw).
Co-Operative
Design, supply and installation of 2000 Kw chilled water system using ammonia refrigeration plant and falling film chiller.